Hall construction
24. January 2022![](https://old.bal.cz/wp-content/uploads/2018/06/hala_upr-800x600.jpg)
Application of the coating system on the construction of the hall – material used: basic industrial anti-corrosion paint TELKYD P110, top synthetic enamel TELKYD T 300 in shade RAL5010
Application of the coating system on the construction of the hall – material used: basic industrial anti-corrosion paint TELKYD P110, top synthetic enamel TELKYD T 300 in shade RAL5010